求职信息

大字标题

大字标题 Glass & Sodium Silicate.
日期 11.11.2018
工作密码 CH1189179

近期【流动】财务状况

职业 Plant Design,Furnace Drawings, Plant Installation ,Startup & Production.
工作类别 ÏîÄ¿¹ÜÀí
活动范围 Container & Tube Glass , Sodium Silicate Plant design, Construction & Production.
在这一个功能中 8 years.
管理经验 28 years.
团队经验 38 years.
海外经验 8 years.
语言 English & Hindi.
年龄 62

职位搜索

职位 Project Manager/ Plant Manager ( GM)
活动范围 Glass & Sodium Silicate Plant & Furnace Design & Drawings ,Project ,Plant operations.
期望薪值 Negotiable.
关联 Full Time
国家/地区 India / Hindu
是否愿意到外地工作?(国外) yes
特定日期 2 months

教育

  • 12 th Standard from UP Boaerd India.
  • Diploma in Ceramics Engg ( Honors) from SHSJ Polytechnic Khurja UP. India.
  • Degree in Ceramics ( Glass) from Indian Institute of Ceramics Tech Calcutta. India.

申请格式

SHANTI SWARUP SHARMA

Vadodara

Contact:+91 9512808731, 9925269265, E-mail: sharmass2003@yahoo.co.in , Skyp:Shantiswarup.sharma

 PROFESSIONAL–OPERATIONS/PROJECT/PRODUCTION/SALES

Proven expertise in leading all technical and commercial functions– Project, Production, Operations, Maintenance, Quality Assurance, project, Resource/Material , ISO -9002 and Marketing Management.

CAREER OBJECTIVE

Dedicated and innovative Professional offering 38 + years experience in Glass & Sodium Silicate (water glass) Projects,  production ,Sales & Resource /Materials etc. in various  industries of different capacities of Glass & Sodium Silicate Plant.

PROFESSIONAL EXPERIENCE

VGK & Sons Ltd Uganda: 2016-18

 Managing for installation of Water Glass Plant Jan 16, Complete Plant designing, Drawings, procurement, installation, training to employee and production with satisfactory quantity & quality for >1.5 years.

 

General Glass Equipment Company USA since 2013 to 2015 as International Associate for Glass Factories and new projects for Africa & Asia.

 

Allied Chemicals Ethiopia : 2013

Automation completed of Sodium Silicate Plant and 50 tpd Glass container project completed.

 

Athi River Mining Ltd (Sodium Silicate Plant ) Plant Kenya 2010 to 2013

                                                      General Manager (Sodium Silicate)

  • Responsible for compete operation (including Sales & Resource/Materials) of Sodium Silicate Glass & liquid plant of production capacity of liquid 180 ton per day , operation of 3 Furnaces having capacity 50-60 ton per day.
  •   New projects , Completed project report for South Africa Water Glass Plant.

 

EXCEL GLASSES LTD, Kerla(A Glass Container Plant) 2009 TO 2010.                    

Dy. GENERAL MANAGER (GLASS)

  • Overall responsible for managing Operation and maintenance of 220 TPD Furnace, Batch House, Laboratory and arrangement of required Refractory with inspection.
  • Played pivotal role in reconstructing from 220 TPD to 250 TPD Furnace.

    JANTAGLASS LTD,VADODARA,India as SR. MANAGER (GLASS)SEPT 07 TO Nov 2009.

  • Overall responsible for managing 180 TPD Glass Container Plant including Furnace construction ,Operation and maintenance.

     

    M/S PHILIPS INDIA LTD,VADODARA as     MANAGER (GLASS) JAN 1998 – AUG 2007

  • Accomplished responsibility for Production. Operation, maintenance & Projects for Glass Plant of 125 TPD/8 TPD Furnaces.
  • Won QIP Philips competition in at Factory level every year and in 2004 at world level in competition held at Borneo , Malaysia.  I was team captain of the Quality improvement Team selected from Vadodara plant Glass Factory.

    HINDUSTAN NATIONAL GLASS LTD, As SR. MGR.–CERAMICS( NOV 97 – JAN 1998 )

  • Worked as SR Manager  at Glass Container Kolkata Plant .

     

    M/S I.G.I. LTD., ABA, NIGERIA as MANAGER – GLASS ( AUG 96 – JUL 1997)

  • Donned the responsibility of producing Amber, Green & Flint Container Glass from one

     

     

     

    M/S GUJARAT GUARDIAN LTD.,India as EXECITVE ENGR (CERAMICS) 91 –1996.

  • Shouldered the responsibility for required Refractory with inspection for 450 tpd furnace & construction.
  • Meticulously handled the operation & maintenance of furnace, batch house, Tin bath, L.P.G. system & Nitrogen Plant.

     

    BALLARPUR INDUSTRIES LTD., INDIA GLAS CONTAINER PLANT:

  • Worked  as Glass Technologist (80 – 91), Contributed significantly in erection & commissioning of 350 TPD and 150 TPD glass furnaces, Required Refractory , Batch house and other jobs related to glass processing.

    HIND LAMPS LTD., SHIKOHADBAD, U.P.   78 – 1980.

  • Gained invaluable experience of working in Maintenance & Operation of Lamp & Tubes–Glass Industries.

     

KEY ACHIEVEMENTS :

  • Selected & deputed to lead a team to present Quality improvement project at Borneo, Malaysia and won Best Exhibition  award in 2004.
  • Distinction of reducing Furnace fuel consumption by energy savings projects.
  • Credited for implementing ISO in Factories and maintaining its documentations..
  • Designed & developed SOP’s & SMP’S and ensured its implementation.

ACADEMIA

  • Inter Mediate UP Board Exam from M.I.College Pahasu,Bulandhahr (UP Board)
  • Diploma in Ceramics Engg. with Honors from S.G.S.J.Polytechnic Khurja U.P.
  • Degree in Ceramics (Glass) Tech. from Indian Inst. of Ceramics Tech ,Kolkata.

TRAINING

  • Strategic Project Management r Lead Auditor ISO 9002 from Buro Veritas Kenya      r          Safety  

COMPUTER LITERACY

Basic, Microsoft Office, Windows 2000, and the Internet.

 

Date of Birth            : 15th Jan 1956                                                               Gender : Male                                

 

Nationality                : Indian                                                                                  Location Preference :  Any where                              

 

Marital Status         : Married                                                                                  Languages Known : English & Hindi

 

 

特别技能

  • Complete Consultancy related to Design and Operations, optimizing Plant efficiency and imparting Training to employees.
  •  Design & Engineering of new age Furnaces for Glass & Sodium Silicate with applicable drawings & material list with specs.
  • Furnace drawings editing (modifications) to meet current requirements with better performance.
  • Furnace construction & Plant Automation.
  • Plant design & Construction with applicable drawings, Material & all Equipment Specs.
  • Supervision of all activities leading to Start up of the Plant until the start of production.