European glass manufacturers have joined together to build the first ever large-scale hybrid furnace to run on 80% green electricity.
For the first time, the industry has adopted a collaborative approach where 20 glass container producers have mobilised resources to work on and fund a pilot project to prove the concept.
With this new technology, it is hoped the industry will be able to produce more than 300 tonnes per day of any glass colour, using high levels of recycled glass.
Ardagh Group has volunteered to build the furnace in Germany. It will be built in 2022, with an assessment of first results planned for 2023.
“We are extremely proud to announce this joint-industry project”, said Michel Giannuzzi, President of FEVE.
“The hybrid technology is a step-change in the way we produce and will enable us to significantly reduce the carbon footprint of glass packaging production.
“The move marks an important milestone for the glass sector in implementing our decarbonisation strategy.”
Martin Petersson, CEO of Ardagh Group, Glass Europe added: “With this new technology we are embarking on the journey to climate-neutral glass packaging, and ensuring the long-term sustainability of manufacturing.
“We aim to demonstrate the viability of electric melting on a commercial scale, which would revolutionise the consumer glass packaging market.”
By adopting a sectorial approach, it also intends to gain the support of the European Commission through the Emission Trading System's (ETS') Finance for Innovation Fund Programme.
Founding member companies of the ‘Furnace of the Future’ project are Allied Glass, Ardagh Group, BA Glass, Beatson Clark, Bormioli Luigi, Gerresheimer, Gurallar Cam Ambalaj (GCA), O-I Europe, Pochet, Saverglass, SGD, Steklarna Hrastnik, Stoelzle, Verallia, Verescence, Vetreria Etrusca, Vetropack, Vidrala, Wiegand-Glas and Zignago Vetro.
08.04.2020, Ardagh Group
此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。
Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.