Case Study: Trust & Durability with Interprojekt flue gas cleaning system

In summer 2005 a new container glass factory with two furnaces was successfully started. At this site Interprojekt installed the mandatory flue gas cleaning system with dry lime injection, electrostatic precipitator, connecting duct work and two parallel fans.

Because of regulatory requirements in summer 2006 Interprojekt added a SCR reactor with catalysts and ammonia water storing and dosing system to the existing installation. 

Yearly inspections of the complete flue gas cleaning system by our professionals allows for trouble-free operation over the years.

The increased flow rate of the two rebuilt furnaces (2018 and 2020) requires an adaption of the flue gas cleaning system. The plant decided for a second independent, but redundant flue gas cleaning side by side of the existing one. The existing stack and the two installed fans are used now for both flue gas cleaning plants. Mandatory was a complete DeNOx system from the very beginning.

Again Interprojekt was selected as reliable supplier. In summer 2020 - despite the corona pandemic - this new/old installation was successfully started.

12.04.2021, Interprojekt Engineering GmbH

此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。

Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.