Will avoid the emission of almost 9,000 t CO2 annually
Vidrala, one of Europe's leading glass producers, has announced the construction of a solar photovoltaic power generation plant, which will be used for consumption in the industrial process, partially substituting fossil and electrical energy from the grid. The facility will be located at the Crisnova plant in Caudete, Castilla La Mancha, and will have a capacity of 12 MW using cutting-edge ground-based technology. The project is part of Vidrala's sustainability and energy efficiency strategy and is a clear demonstration of its commitment to the environment and to the communities where the group operates.
Vidrala has carried out the engineering, technical and economic viability work, urban planning, administrative and environmental procedures, as well as the engineering project under the advisory services of the company Norvento Enerxía. During the first quarter of this year, the construction works have started, with Norvento as project manager and Grupotec in the installation and commissioning of the project, which will avoid the emission of about 9,000 tonnes of CO2 into the atmosphere per year.
This initiative is part of the ambitious investment plan launched by the Vidrala Group and is part of the multi-year green agenda focused on improving the sustainability of the glass container production process. The project, which began to be analysed last year, is a reflection of the commitment to climate change and aims to reduce the company's environmental impact.
This action is part of the Vidrala Glass Made Good strategy, implemented through the 4Ps that develop four fundamental pillars for the glass company: Prosperity, People, Place and Planet.
The Crisnova plant was built by Vidrala in Caudete in 1989 and is currently one of the most important glass plants in Spain with an annual production of almost 900 million glass containers.
This will not be the first time that the Vidrala Group has implemented this type of technology to supply its facilities with green energy; it already did so in 2018 in Portugal after installing a solar plant at its logistics facilities in Marinha Grande.
05.04.2022, Vidrala
此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。
Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.