VETRIERIE RIUNITE REBUILDS THE “CENTAURO” FURNACE

During the summer months, Vetrerie Riunite began reconstruction work on the second furnace, known as the Centaur, in order to increase its production capacity.

Specifically, with regard to the old structure, the vault, superstructure and regeneration chamber have been maintained. In contrast, all glass conditioning and distribution channels and other parts of the furnace in direct contact with the glass are under construction.

The companies that contributed to the renovation of the furnace are Tecsiglass, which handled the design, demolition and reconstruction of the structure, as well as the updating of the software part, along with Fila termoidraulica, which handled the construction of the compressed air, methane and technological water systems, and C.D.M., which handled the heavy carpentry part. Finally, Alca handled the upgrading of the electrical system.

The reconstruction of the furnace will allow the production of 190 tons of glass per day, instead of 175, so as to be increasingly competitive in the market.

In this way, Vetrerie Riunite consolidates its leading position in the world market for glass doors for washing machines and dryers.

24.08.2022, vetrerie

此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。

Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.