Berry Global’s manufacturing plant in Steinfeld, Germany has achieved Valpak’s Zero Waste- -to-Landfill accreditation, demonstrating the advantages of continuous operational improvements and on-site recycling capabilities. Steinfeld is now the third of Berry’s European flexible films plants to achieve this recognition, alongside the facilities at Rhymney and Heanor in the United Kingdom.
The achievement is in line with Berry’s sustainability goals and BMore Together initiative, both with a focus on mitigating the environmental impact of waste created within its direct operations. As part of the company’s sustainability strategy, Berry has set a company-wide target of reducing landfill waste intensity by 5% year-over-year. In 2022, Berry exceeded its target with an overall reduction of 8% landfill waste intensity.
Berry’s Steinfeld operation produces premium quality industrial packaging, including Form Fill Seal (FFS) primary packaging for the chemical industry and shrink hood and advanced stretch hoods for transport and pallet protection that are widely used in a variety of industries such as the building and glass industry. The site also produces printed sheet packaging solutions for beverages and the peat and wood processing industry.
Steinfeld’s Zero Waste-to-Landfill activities focus on reducing the waste generated across the entire site, as well as implementing programs to re-use waste, diverting it from landfill to high-value usage. Continuous improvement projects that Steinfeld has been working on in the past year include a project which has both reduced the amount of scrap generated during the production process and ensured that any remaining waste material is re-used.
Further demonstrating important environmental initiatives as part of its production facilities, Steinfeld’s on-site recycling centre reprocesses post-consumer single variety film waste into regranulate for use in new packaging products. The centre has two recycling lines one of which is Berry's unique Norec® de-inking process that de-contaminates and recycles post-consumer coloured PE films. In addition, Steinfeld has its own Cogeneration Plant that undertakes the disposal of solvent-bearing exhaust air and supplies the site with self-generated electrical power and thermal energy.
Nande Van Aken, Site Director at Berry in Steinfeld, commented: “Reducing waste is critical to efficient production and a key part of Berry’s ongoing sustainability strategy. We are delighted to receive the Zero Waste-to-Landfill recognition from Valpak and will continue our program of continuous improvement to identify new ways to not only have no waste to landfill but also reduce the impact of waste on the environment in general.”
14.09.2023, Berry Global
此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。
Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.