Pilkington UK to scale low carbon glass production under hydrogen plans

Pilkington UK will scale its production of low carbon glass from 2027 under plans with Grenian Hydrogen to produce green hydrogen at its manufacturing base.

A hydrogen plant at Pilkington UK’s Greengate Works site in St Helens will provide the manufacturer with up to seven tonnes of zero-emission hydrogen each day. 

This will enable the company to eliminate 15,000 tonnes of carbon from its direct emissions each year, paving the way for the expanded production of low carbon architectural glass for buildings.

Plans to build the hydrogen plant powered by renewable electricity were put forward for public consultation last month ahead of Grenian Hydrogen submitting a planning application this summer. 

It aims to start construction at Greengate Works in 2025, and to begin decarbonising Pilkington UK and the surrounding industry by 2027. The project at Pilkington UK is the first that Grenian will submit for planning permission.

Neil Syder, managing director at Pilkington UK, said: “Securing a cost-effective, high-volume supply of green hydrogen at our Greengate site allows us to permanently scale the production of low carbon glass. 

"As an integral supply chain material into the built environment, this represents an important cornerstone in the delivery of carbon free buildings – by enabling the specification of low carbon glass to become more routine for architects and specifiers."

15.07.2024, Pilkington

此网站新闻材料的版权属于公司或第三方的新闻提供者,其所有权利保留。所有新闻材料对其访问者只能限于其本人使用,并且使用此材料的风险由其使用者独自自行承担。严禁对新闻材料进行再次发布和其它商业利用. 作为商业贸易的用途。如果新闻材料由第三方提供,当应用此新闻材料时,每个使用者都同意遵守,并且受此特定的项目的约束。Glass Global并不代表及认可新闻材料中所包含的内容及新闻中的外部网站的内容的准确性及可靠性。

Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.